industry
Fast Food
project
Technology update/refresh
timeframe
9 months
size
1,400 stores
total assets
23,000
With the deadline for PCI compliance fast approaching, our customer needed to move quickly to upgrade technology at all of its 1,400 fast food locations. They also wanted to use the opportunity to install hardware at every location to improve employee productivity. Among other steps, this involved removing old cable and installing new cabling infrastructure to ensure consistent equipment and network performance at all locations. Since stores needed to remain open during the technology upgrade, Bailiwick® performed all installations between 9 PM and 6 AM (4:30 AM at locations that served breakfast) and finished all work at each location in one night.
1,400
quick serve
locations
This customer chose Bailiwick because of our ability to organize quickly and execute flawlessly, as well as our proven nimbleness at managing complex operations on a large scale. As with so many of our IT projects, planning and preparation occurred simultaneously, but with no impact on our usual high quality results. Early in the project, we spent two weeks conducting on-site, in-depth training with our lead technicians, an essential step that enabled them to instill the project requirements with other teams.
In this particular case, we also helped the customer work through challenges on sites in the U.S. and Canada, as well as manage expanded scope that required more than one visit to certain stores. In the end, we provided a complete turnkey solution that included:
Among the challenges we overcame during the project were:
The true measure of Bailiwick's ability to organize, plan and deploy assets on a project this massive can be summed up in one telling anecdote: We moved faster than our customer anticipated, so much so that they asked us to slow down our schedule. The technology upgrade turned out to be one of the most successful projects this fast food chain has deployed. As a result, Bailiwick has been involved in additional projects, including new site openings and additional technology refreshes.
upgraded
23,000
devices
across entire chain
planning
Planning was implemented with maximum precision. Bailiwick's project team engineered a forecast of inventory levels and processing capacity, ensuring that equipment would be available to meet established timeframes.
technician
training
Vigorous technician training was conducted before the start of the project - Bailiwick personnel were prepared for any and all issues that arose during the process.
quick turn
around
Cost-savings were significant, thanks to Bailiwick's expedited turn around of existing hardware.
communication
Live communication between Bailiwick and the retail locations insured its success.
proactive
By being proactive with strategies and solutions, Bailiwick successfully orchestrated the upgrade, delivering an outcome to the client that surpassed their original expectations.
Curiosity and creative problem-solving.
Get in touch and let us know how we can help your business.